gillish

Schedule a link

A managed link can start on a day, end on a day, or end after a number of clicks. You decide where visitors go before it starts and what they get once it has ended.

  1. Open a managed link under Manage Links and open Scheduling.

  2. Set a Start date. Left empty, the link works from now on.

  3. In Before the start date, pick what visitors get until then (the four choices are below).

  4. With Send visitors to the address below, enter that address in Address for this link before it starts, for example a page that says the offer is coming soon, and pick how your posts show the link in In your posts before the start. You can leave the address empty.

  5. Set an End date. Left empty, the link never ends.

  6. Set a Click limit. 0 means no limit; when the limit is reached, the link ends.

  7. Under When the link ends, choose what visitors get (see below).

  8. Leave the Status switch on, and click Update link to save.

The Scheduling section of a managed link with a start and an end date set: Start date, End date, Click limit, Before the start date, In your posts before the start, Address for this link before it starts, When the link ends, and Address for this link when it has ended or is switched off.
The Scheduling section of a managed link, with a start and an end date set.

The section shows a choice only when it does something. With no dates and no click limit, you see the two dates, Click limit and Address for this link when it has ended or is switched off. That address always shows, because a link you switch off yourself sends its visitors there too. Set a Start date and Before the start date appears; pick Send visitors to the address below there and In your posts before the start and Address for this link before it starts appear. Set an End date or a Click limit above 0 and When the link ends appears. A choice you hide again keeps what you entered, so nothing is lost if you change your mind.

Both dates use your site’s time zone. To remove a date, empty the field and click Update link.

Before the start date

The four choices under Before the start date:

  • Send visitors to the address below (the choice a new link starts with): someone who opens the short address goes to Address for this link before it starts. When that is empty, they go to Address for ended links under Settings → Link Management, and when that is empty too, to your home page. In your posts the link shows as words without a link, or, with In your posts before the start set to Link to the address below, as a link readers can click to reach that address already.
  • Send visitors to the target anyway: the link works before its start date, in your posts and as a temporary redirect to the target.
  • Keep the link switched off until then: the link behaves as a switched-off link. Its visitors go to Address for this link when it has ended or is switched off (then the address for ended links under Settings, then your home page), and in your posts it shows as words without a link. Manage Links shows it as Off until and the date. You do not switch it on yourself.
  • Show “page not found”: the short address answers “page not found”, as if the link did not exist yet, which keeps a launch secret until it opens. In your posts it shows as words without a link.

Whatever you pick, until the start date:

  • Manage Links shows the link as Scheduled, starts and the date, for example “Scheduled, starts 3 Nov 2026” (or Off until and the date).
  • The Dashboard lists the link in its Scheduled links card, which shows the first five to start, the soonest first. The Scheduled button in Manage Links shows the links that are switched on and wait for their start date.
  • When the link ends has no effect; it is for after the end.
  • Visits to the short address are counted on their own, not as clicks, so they add nothing to Link Analytics or the click limit; robots are left out. The closed Scheduling section shows the count, for example “Starts 3 Nov 2026, 4 visits before the start”.

On the start date the link starts by itself, whichever choice you made: its address sends visitors to the target, each click is counted, and in your posts it is a link. Nothing needs to run at that moment, because Node checks the date on every visit. To start a link at once, empty Start date and click Update link.

What visitors get when it ends

Your choice under When the link ends applies after the end date and past the click limit:

  • Send visitors to the address below: the link shows as plain text in your posts, and someone who still opens its short address, for example from an old email, is sent to Address for this link when it has ended or is switched off, such as the shop’s page for the same product. When that is empty, they go to Address for ended links under Settings → Link Management, and when that is empty too, to your home page.
  • Send visitors to the target anyway: after the end, the link keeps working, in your posts and as a temporary redirect. Before the start date, Before the start date decides instead.
  • Switch the link off: as the first choice, and the link’s Status switch is turned off once it has ended, when you next open the Dashboard or Manage Links. A link is never switched off before its start date.

An ended link never answers “page not found”. A link you switch off yourself behaves the same way: plain text in your posts, and its visitors go to the address for ended links. Direct links are written into your post as they are, so they stay links; their visitors are sent on in the same way.

Each link counts the visits it sent on after it ended, to the address for ended links or, with Send visitors to the target anyway, to its target. Visits from robots are not counted. The closed Scheduling section shows the end date and that count. When links have ended but are still switched on, the Dashboard says so under Links to check, and the Ended button in Manage Links lists them.

Next, read Track each placement with sub-IDs.